HOME/SERVICES/POWER QUALITY STUDY
Arab Tower Services

Power Quality Study

Power quality and harmonic studies delivered across the UAE and internationally — measuring and analysing harmonic distortion, voltage quality and power factor, with findings assessed against IEEE 519 and mitigation options reported.

Overview

Power quality and harmonic studies delivered across the UAE and internationally — measuring and analysing harmonic distortion, voltage quality and power factor, with findings assessed against IEEE 519 and mitigation options reported.

Power quality and harmonic analysis with a power analyzer

Frequently asked questions

What is a power quality study?
A metered survey of your electricity — power factor, harmonics and voltage quality — logged over about a week and assessed against IEEE 519, with a correctly sized correction. See our plain-English guide.
How long does the study take?
Typically seven continuous days of logging to capture your full load cycle, followed by analysis and a report.
Will it remove my utility power-factor penalty?
If low power factor is the cause, correcting it removes the reactive-power (kVARh) surcharge and often frees up capacity.

Need power quality study?

Tell us about your project and our engineers will respond with a tailored proposal.

Diesel GeneratorsHV / LV SwitchgearTransformersPackage SubstationsUPS SystemsVoltage StabilizersLED LightingSolar & StorageChillers & AHUVRF SystemsSTP & Water TreatmentEngineering DesignDiesel GeneratorsHV / LV SwitchgearTransformersPackage SubstationsUPS SystemsVoltage StabilizersLED LightingSolar & StorageChillers & AHUVRF SystemsSTP & Water TreatmentEngineering Design