Hospitals that can't lose power. Resorts a boat-ride from the nearest grid. Municipal sites, estates and industrial facilities. Engineered, installed, tested — and handed over working.
A cross-section of referenced work — healthcare standby power, MV substations, testing and municipal infrastructure.

Complete hospital backup-power package: multi-set generator plant with related civil works, LV switchgear and cabling — one of ATEC's largest healthcare power projects. Delivered with main contractor MBCC for Emirates Health Services.

Hospital backup generator plant with related civil, switchgear and cabling works — engineered, installed, tested and commissioned for Emirates Health Services with main contractor MBCC.

Backup generator, civil, switchgear and cabling works for Fujairah Hospital, followed by a five-site generator programme across EHS health centres — Preventive Health, Al Hala, Muzeirah, Marbah and Wadi Sidr.

Supply and installation of 12 ATS panels with cabling works, plus managed rental generation keeping the hospital powered for 52 months. Delivered with MBCC for Emirates Health Services.

Supply, installation, testing and commissioning of an 11 kV package substation with connector and LV panel for an ultra-luxury island resort — engineered in the UAE, delivered and energized offshore.
Supply and installation of 11 kV switchgear and a 2000 kVA transformer with related civil, air-conditioning and firefighting works — currently in delivery with main contractor MBCC.
LV capacitor-bank panel and related works for substation SS 1013A, Transformer No. 2 — power-factor correction inside a live hospital substation.
Eight standby generators from 150 to 1100 kVA with ATS panels, cabling and civil works — a complete estate-wide backup power system.

Electrical works at Al Qusais including supply and installation of light poles and switchgear, and a generator installation for the Lahbab soil-disposal area.

Power quality analysis, insulation and secondary-injection testing, load calculations and load schedules for a B+G+3 shopping complex.
The same teams, from first concrete pour to thermal survey at handover.








Send the scope — our engineers respond with a configured proposal within one business day.